Well got some work done to the car the last month or so.
Redone the engine bay with painted plenums both upper and lower, new gaskets, painted engine cover with stickers.
Powder coated dogbone mount and poly bushed, powder coated subframe brackets.
Inside I have got new RS floor mats, new front and rear speakers also.
Outside I got the smaller front plate and silver indicator bulbs both front and back.
Engine work I done a full service using Renault parts.
The goodies I still have are AST solid top mounts, full black forge silicone hose kit, new rear discs and pads, new rear hand brake cables and mocal brake pipe flexes.
And how she sits
Redone the engine bay with painted plenums both upper and lower, new gaskets, painted engine cover with stickers.
Powder coated dogbone mount and poly bushed, powder coated subframe brackets.
Inside I have got new RS floor mats, new front and rear speakers also.
Outside I got the smaller front plate and silver indicator bulbs both front and back.
Engine work I done a full service using Renault parts.
The goodies I still have are AST solid top mounts, full black forge silicone hose kit, new rear discs and pads, new rear hand brake cables and mocal brake pipe flexes.
And how she sits